§ VIII · Electrical

Voltage Drop Calculator

Cable temperature, R/X data and a shared feeder budget, with the working shown.

  • Updated 2026-11-25
  • Free · no sign-up
  • Runs in your browser
Voltage dropconductor · length · load
Branch cable model and data

Temperature means the conductor temperature, not ambient. Supplied R is already at operating temperature and is not corrected again. X defaults to zero: enter cable data when reactance matters. No automatic manufacturer lookup is performed.

Feeder + final circuit budget

Total voltage drop · rounded model estimate

7.467V3.246 %

Above your 3 % total design budget. Voltage drop only; this is not a code-compliance verdict.

Branch: 7.467 V. Upstream: 0 V. Budget remaining after both: -0.2464 percentage points.

At the load
222.5 V
Maximum branch length in remaining budget
36.96 m
Smallest stocked size at 3 %
10 mm²

Voltage-only size; X is held fixed across candidates. Verify the selected cable data and ampacity.

Working

  1. 01

    Temperature-adjusted resistance

    ρ(T) = 0.0175 × [1 + 0.00393 × (20 − 20)] = 0.0175 Ω·mm²/m; R = ρ(T)·L/A = 0.116666666667 Ω.

  2. 02

    Return path factor

    For a two-wire DC or single-phase circuit, count both outgoing and return conductors with factor 2.

  3. 03

    Voltage drop

    Vd = 2·I·L·(R/km·cosφ + X/km·sinφ)/1000 = 7.46666666667 V. I = 32 A; L = 40 m; R/km = 2.91666666667; X/km = 0; cosφ = 1; sinφ ≈ 0. DC uses cosφ = 1 and X = 0.

  4. 04

    As a percentage of the supply

    7.46666666667 ÷ 230 × 100 = 3.24637681159 %

  5. 05

    Shared budget and remaining branch length

    Available branch budget = 6.9 − 0 = 6.9 V. Divide a positive remainder by 0.186666666667 V/m for the maximum branch length. Total drop = 7.46666666667 V.

Try one

Rounded steady-state model estimate. Nominal material constants are assumptions, not manufacturer cable data. Ampacity, grouping, protection, motor starting and supply impedance require separate checks. The budget is your input; no national code-compliance verdict is made.

Compare cable plans

Compare two to four plans using the supply, load and total budget entered above. Each plan has independent cable data. “Use current cable inputs” copies the main panel's cable settings into one plan.

Shared: single · 230 V · branch 32 A · branch PF 1 lagging · total budget 3 %. Included feeders use 32 A and PF 1 lagging.

To change feeder current or power factor, enable the feeder in the main panel above. Plan feeder switches are independent. All segments share the same voltage and circuit system.

Branch

Nominal material constants; temperature is the conductor temperature, not ambient. X = 0 is an assumption.

Branch

Nominal material constants; temperature is the conductor temperature, not ambient. X = 0 is an assumption.

Results · rounded model estimates
MeasurePlan 1Plan 2
Design budgetAbove budgetWithin budget
Total drop7.4667 V / 3.2464 %4.48 V / 1.9478 %
Branch / feeder drop7.4667 / 0 V4.48 / 0 V
At the load222.53 V225.52 V
Budget left (percentage points)-0.246381.0522
Maximum branch length36.964 m61.607 m

Plan 1 · assumptions and working

Branch: 40 m one-way; copper, 6 mm², 20 °C; nominal area model; X 0 Ω/km. Source: Not supplied.

Feeder: Not included; upstream drop assumed zero.

Above your 3 % total design budget. Voltage drop only; this is not a code-compliance verdict.

Show calculation steps
  1. 01

    Temperature-adjusted resistance

    ρ(T) = 0.0175 × [1 + 0.00393 × (20 − 20)] = 0.0175 Ω·mm²/m; R = ρ(T)·L/A = 0.116666666667 Ω.

  2. 02

    Return path factor

    For a two-wire DC or single-phase circuit, count both outgoing and return conductors with factor 2.

  3. 03

    Voltage drop

    Vd = 2·I·L·(R/km·cosφ + X/km·sinφ)/1000 = 7.46666666667 V. I = 32 A; L = 40 m; R/km = 2.91666666667; X/km = 0; cosφ = 1; sinφ ≈ 0. DC uses cosφ = 1 and X = 0.

  4. 04

    As a percentage of the supply

    7.46666666667 ÷ 230 × 100 = 3.24637681159 %

  5. 05

    Shared budget and remaining branch length

    Available branch budget = 6.9 − 0 = 6.9 V. Divide a positive remainder by 0.186666666667 V/m for the maximum branch length. Total drop = 7.46666666667 V.

Plan 2 · assumptions and working

Branch: 40 m one-way; copper, 10 mm², 20 °C; nominal area model; X 0 Ω/km. Source: Not supplied.

Feeder: Not included; upstream drop assumed zero.

Within your 3 % total design budget. Voltage drop only; this is not a code-compliance verdict.

Show calculation steps
  1. 01

    Temperature-adjusted resistance

    ρ(T) = 0.0175 × [1 + 0.00393 × (20 − 20)] = 0.0175 Ω·mm²/m; R = ρ(T)·L/A = 0.07 Ω.

  2. 02

    Return path factor

    For a two-wire DC or single-phase circuit, count both outgoing and return conductors with factor 2.

  3. 03

    Voltage drop

    Vd = 2·I·L·(R/km·cosφ + X/km·sinφ)/1000 = 4.48 V. I = 32 A; L = 40 m; R/km = 1.75; X/km = 0; cosφ = 1; sinφ ≈ 0. DC uses cosφ = 1 and X = 0.

  4. 04

    As a percentage of the supply

    4.48 ÷ 230 × 100 = 1.94782608696 %

  5. 05

    Shared budget and remaining branch length

    Available branch budget = 6.9 − 0 = 6.9 V. Divide a positive remainder by 0.112 V/m for the maximum branch length. Total drop = 4.48 V.

Voltage-drop comparison only. Nominal models and supplied cable data may use different assumptions; compare their sources before choosing. No price ranking, ampacity, protection, motor-starting or national compliance assessment is made. R/X values apply only to their specified cable.

Compared with a basic calculator

TaskBasic calculatorThis page
ModelEnter the cable formula manuallySingle-phase, DC or balanced three-phase
Cable dataLook up and enter parametersTemperature-adjusted nominal resistance or supplied operating R/X
SizingRearrange and compare sizesFeeder + branch budget; nominal-model size and maximum branch length
Plan comparisonRecord each result manuallyTwo to four cable plans with shared load, source notes, URL sharing and print records
LimitsNo installation modelSteady-state voltage drop only; no code-compliance verdict

How to use it

§ How to use
  1. 01

    Pick the circuit: single-phase, three-phase, or direct current. That choice sets the factor — 2 or √3.

  2. 02

    Choose nominal area and conductor temperature, or enter operating resistance from cable data. Record the source and enter reactance when needed.

  3. 03

    Enter the supply voltage, current, one-way length and lagging power factor. Optionally include an upstream feeder on the same voltage and circuit system.

  4. 04

    Enter a total design budget. Read both segment drops, the remaining budget and the maximum branch length. Check the reference scope separately.

  5. 05

    Compare two to four cable plans below the main panel. Supply, load and budget stay shared; cable inputs are independent. Copy a comparison link or print the assumptions and working.

Same load, three cable sizes

§ 02

32 A at 230 V, single-phase copper, 20 °C, X = 0, unity power factor, no upstream feeder.

Run2.5 mm²6 mm²16 mm²
20 m3.90 %1.62 %0.61 %
40 m7.79 %3.25 %1.22 %
60 m11.69 %4.87 %1.83 %

Doubling the length doubles the drop; quadrupling the cross-section quarters it. Nothing else in the formula moves.

Where the number comes from

§ 03

A conductor of length L metres and cross-section A square millimetres has a resistance that follows from its resistivity ρ:

R = ρ · L / A

With 32 A drawn through 40 m of 6 mm² copper, R is 0.0175 × 40 ÷ 6 ≈ 0.1167 Ω per conductor. The drop is that resistance multiplied by the current and by the factor that accounts for how the current returns:

ρ(T) = ρ20 · [1 + α · (T − 20)]

single-phase: Vd = 2 · I · L · (R/km · cos φ + X/km · sin φ) / 1000

three-phase: replace 2 with √3; DC: use 2, cos φ = 1, X = 0

R/km and X/km are the resistance and reactance of one conductor per kilometre; L is the one-way length in metres. Supplied operating resistance bypasses the nominal temperature correction. The AC expression is a longitudinal steady-state approximation, not a full phasor load-flow solution.

Here it gives 2 × 32 × 0.1167 ≈ 7.47 V, which is 3.25 % of 230 V — just over the three percent line. The same load on 10 mm² gives 4.48 V and 1.95 %, which is why the suggested size is 10 and not 6.

What this model leaves out

The nominal resistance model does not derive skin or proximity effects, conductor temperature, grouping derating, ampacity or protection settings. Supplied operating AC resistance can account for cable-specific effects only to the extent stated by its source. Supply impedance, unbalanced networks, motor starting and leading loads are outside this model. Neither the temperature input range nor a voltage-drop result certifies that a cable can operate at that temperature.

The limits

Choose a voltage-drop budget from the specification that applies to your project, then enter that percentage in the panel. The default 3 % is a worked design assumption, not a universal regulatory limit. A feeder may share a total budget with downstream circuits; allocate that budget before sizing this run. A rule about voltage at equipment terminals is not necessarily a limit on the drop in one cable.

GB 50054, the IEC 60364 family and national wiring rules have different scopes, editions and installation conditions. This page has no verified clause-by-clause ruleset for them and does not select one on your behalf. Check the applicable edition and local adoption, record the clause and its conditions, and enter your chosen budget. The calculation can be reproduced from the shared link, including that budget; it does not issue a compliance certificate.

Reproduce the cable choice

With 32 A, 40 m, copper at 20 °C and a 230 V supply, the numerator 2·I·L·ρ is 44.8. Three percent of 230 V is 6.9 V, so the minimum area is 44.8/6.9 = 6.4927536… mm². A 6 mm² cable falls below that minimum; 10 mm² is the next stocked size. At a 5 % budget, the minimum becomes 44.8/11.5 = 3.895652… mm², so 4 mm² meets this voltage-only model. Changing the budget does not change the cable’s current-carrying capacity.

The constants used

§ 04
Resistivity, copper0.0175 Ω·mm²/m
Resistivity, aluminium0.0282 Ω·mm²/m
Single-phase factor2
Three-phase factor√3 ≈ 1.732
Copper temperature coefficient0.00393 / °C
Aluminium temperature coefficient0.00403 / °C
Default reactance assumption0 Ω/km; user adjustable

These are nominal model assumptions. At 70 °C this model gives copper resistivity 0.0175 × [1 + 0.00393 × 50] = 0.02093875 Ω·mm²/m. Actual cable resistance can differ; use the supplied operating R/X mode for cable-specific data.

Same cable, different conductor temperature

§ 06

For single-phase copper at 230 V, 16 A, 30 m, 2.5 mm², unity power factor and zero reactance, the 20 °C model gives 6.72 V (2.92 %). At 70 °C, resistance is multiplied by 1.1965 and the drop becomes 8.04048 V (3.50 %). The result crosses a 3 % design budget solely because the temperature assumption changed.

Open the 20 °C example · Open the 70 °C example.

Allocate the feeder and branch budget

At 230 V, a 3 % total budget is 6.9 V. A copper feeder carrying 32 A over 20 m at 16 mm² and 20 °C loses 1.4 V. A branch carrying 16 A over 30 m at 2.5 mm² loses 6.72 V. With unity power factor and X = 0 for both, total drop is 8.12 V (3.53 %), above budget. The branch has only 5.5 V available, so its maximum length at the same size is about 24.55 m; the next nominal size meeting the budget for 30 m is 4 mm². The feeder current may include other downstream loads.

Open the two-segment example. Both segments must share the same voltage and circuit system. A transformer or a mixed single/three-phase network needs a different analysis.

Reference limits and their scope

§ 07

Sources reviewed 25 November 2026. Reference information, not an implemented compliance ruleset.

Supply scopeLightingOther uses
Public LV supply3 %5 %
Private LV supply6 %8 %

The table is reproduced from Schneider Electric's public guide, which attributes it to IEC 60364-5-52 Table G.52.1. It covers steady-state drop from the installation origin to the load point, not an independent allowance for every cable segment. Motor starting is outside these steady-state values. Full normative exceptions and local adoption have not been verified here.

There is no verified GB, DIN/VDE, JIS, NEC or AS/NZS clause engine here. A language, country or reference percentage alone cannot determine compliance. Check the applicable edition, local adoption, supply arrangement, load type and total feeder budget before entering a design limit.

Questions

§ 05
How do I compare two cable plans?
Set the supply, branch current, power factor and total budget in the main panel. The comparison below starts with 6 and 10 mm² copper branches at 40 m and 20 °C. Edit each plan independently, optionally include a feeder, and compare total drop, load voltage and remaining budget. Shared feeder current and power factor come from the main panel. Use current cable inputs to copy its cable settings into a plan. Copy comparison link shares all plans and their sources; Print comparison produces a calculation record. A plan within the voltage budget still needs ampacity and protection checks.
How much voltage drop is too much?
Use the project specification and the applicable wiring rules to choose a budget. This panel defaults to 3 % as a design example and also shows a 5 % reference in the explanation. Neither figure is a universal legal limit. Enter your chosen percentage and verify its scope and edition separately.
Why does it double the current for single phase but only multiply by √3 for three?
In a single-phase circuit the current has to travel out along the live conductor and back along the neutral, so the run is counted twice. In a balanced three-phase circuit the return current is carried by the other two phases, and the geometric sum of three currents 120° apart gives √3 — about 1.732 — rather than 2.
Does the power factor have to be entered?
Use 1 for a resistive load. DC ignores power factor and reactance. For AC, enter a lagging power factor and cable reactance: the longitudinal drop uses R cosφ + X sinφ. Reducing power factor does not necessarily reduce voltage drop when reactance is included. Leading loads are outside this model.
What does “longest run at 3 %” tell me?
Hold the branch cable data and current fixed, subtract the upstream feeder drop from the total design budget, then divide the available volts by the branch drop per metre. Zero means the upstream feeder already uses the entire budget. This is not an ampacity or protection check.
Why is the suggested size sometimes bigger than I expected?
In the nominal model, the suggestion is the smallest listed size that meets the remaining voltage budget with X held fixed. The series runs from 1.5 to 300 mm². For the default single segment the minimum is 6.493 mm², so the next size is 10 mm². Supplied R/X data describes one cable and cannot establish the resistance of other sizes, so that mode has no size suggestion. Verify actual candidate cable data, ampacity and protection separately.
Can I use the result for a motor start?
No. A motor draws five to eight times its running current while starting, and the drop during that second is what makes contactors chatter and drives trip. This page computes the steady-state drop; a start needs the starting current and, usually, the manufacturer’s limit.
How is aluminium different?
The nominal model uses 0.0282 Ω·mm²/m for aluminium and 0.0175 for copper at 20 °C, with temperature coefficients 0.00403 and 0.00393 per °C respectively. These are model assumptions, not certified values for every cable. Use manufacturer operating resistance when available, and select suitable terminations separately.
Why does my cable app disagree with this number?
Compare the conductor temperature, resistance source, reactance, units, one-way length, circuit system and feeder scope first. This panel defaults to nominal resistance at 20 °C and X = 0, but allows temperature correction or supplied operating R/X. Grouping and ambient conditions affect ampacity and temperature; this panel does not calculate those effects automatically.